How JustAnswer Works:

  • Ask an Expert
    Experts are full of valuable knowledge and are ready to help with any question. Credentials confirmed by a Fortune 500 verification firm.
  • Get a Professional Answer
    Via email, text message, or notification as you wait on our site.
    Ask follow up questions if you need to.
  • 100% Satisfaction Guarantee
    Rate the answer you receive.

Ask Rick Your Own Question

Rick
Rick, Small Engine Technician
Category: Small Engine
Satisfied Customers: 3844
Experience:  Outdoor Power Equipment technical trainer since 1990, covering eight states.
20444326
Type Your Small Engine Question Here...
Rick is online now

How long a lead can I fit to my Bosch Rotak 43cm 1800w

Customer Question

How long a lead can I fit to my Bosch Rotak '43cm' 1800w
Submitted: 3 years ago.
Category: Small Engine
Expert:  Curtis B. replied 3 years ago.
You want to know what length of extension cord you can use? There is loss in any extension, but by using a larger gage wire for the extension, you can go at least 100ft. A 12 gage cord will carry more amperage than a 14 gage cord. For longer distance, you need larger gage wire.
Customer: replied 3 years ago.

Can I just clarify please. My question didn't mention extension leads; it asked How Long A lead? I am fitting a new lead as the existing one is chopped half way along it's length! 'er-in-doors' ......, or rather ('er-out-doors) wanted the lead longer than previously........., so total length from mower to 13amp plug (with RCD) was the question... Thanks,


Am looking at 22metres? I understand heavier guages mean further length is possible.... These machines come with 15 metres of cable as standard, don't know what 'Gauge' though, Trevor

Expert:  Curtis B. replied 3 years ago.

Ok,same thing applys. You want to have longer lead, you need a larger diameter wire. Gage is wire size. the bigger the number, like 18 gage, is smaller size. Smaller number is XXXXX wire diameter. The larger diameter of the copper wire , the longer the lead can be. 22 meters is equivalent to 75 ft. Select wire lead one size larger than you have now and it will work. Your hardware man should be able to determine what you have now and can give you the next size up.

Customer: replied 3 years ago.

Hi Curtis,


I didn't realise you were in the US of A...., and I'm in little old England.


Didn't think my question was complicated. I'll give it one more try.


The lawn-Mower's Motor is rated at 1800 Watts. It came with 15 mtrs of cable (you say wire!). I don't know what gauge (you say gage).. My question is...., What is the maximum length of wire I can go to using the same gage as original. This is England remember, everyone clocks off at 12:00 GMT (That's 07:00 EST) on a Saturday ! It's now 15:45 our time, so It'll be 10:45 wherever you are. Trevor

Expert:  Curtis B. replied 3 years ago.
Without going to a larger gauge cable, you are limited to the same 15 meters . To add more cable, you need larger gauge cable to go to 22 meters. Texas.9:47
Customer: replied 3 years ago.

Thanks Curtis,


 


We got there in the end,


Cheers from England

Expert:  Curtis B. replied 3 years ago.
Thanks!

What Customers are Saying:

 
 
 
  • You did one super job of explaining to me everything there is to know about this fridge. I'm looking forward to asking you questions in the future. Jimmy
< Previous | Next >
  • You did one super job of explaining to me everything there is to know about this fridge. I'm looking forward to asking you questions in the future. Jimmy
  • Wonderful service, prompt, efficient, and accurate. Couldn't have asked for more. I cannot thank you enough for your help. Mary C.
  • This expert is wonderful. They truly know what they are talking about, and they actually care about you. They really helped put my nerves at ease. Thank you so much!!!! Alex
  • Thank you for all your help. It is nice to know that this service is here for people like myself, who need answers fast and are not sure who to consult. GP
  • I couldn't be more satisfied! This is the site I will always come to when I need a second opinion. Justin
  • Just let me say that this encounter has been entirely professional and most helpful. I liked that I could ask additional questions and get answered in a very short turn around. Esther
  • Wonderful service, prompt, efficient, and accurate. Couldn't have asked for more. I cannot thank you enough for your help. Mary C.
 
 
 

Meet The Experts:

 
 
 
  • Jon K.

    Jon K.

    Small engine diagnostic expert

    Satisfied Customers:

    2823
    Gold certified Stihl tech, Service Manager for a rental/repair shop.Certified in most small engines
< Previous | Next >
  • http://ww2.justanswer.co.uk/uploads/jonrk/2010-1-5_22551_jon.jpg Jon K.'s Avatar

    Jon K.

    Small engine diagnostic expert

    Satisfied Customers:

    2823
    Gold certified Stihl tech, Service Manager for a rental/repair shop.Certified in most small engines
  • http://ww2.justanswer.co.uk/uploads/KO/koboma/2012-6-6_20917_DSCF1022.64x64.JPG Curtis B.'s Avatar

    Curtis B.

    Technician

    Satisfied Customers:

    180
    Service manager and technician for all brands of engines with 40 + years of experience.
  • http://ww2.justanswer.co.uk/uploads/HA/HankF/2013-8-27_12514_JAProfilepic.64x64.JPG Hank F.'s Avatar

    Hank F.

    Technician

    Satisfied Customers:

    5360
    Certified on Onan and Generac generators.
  • http://ww2.justanswer.co.uk/uploads/RA/ranwell1/2013-5-23_17421_2fixed3.5x5.64x64.jpg ranwell1's Avatar

    ranwell1

    Small Engine Technician

    Satisfied Customers:

    5039
    Owner of Large Small engine repair business. Over 39 years. Certified both 2-cycle and 4-cycle engines
  • http://ww2.justanswer.co.uk/uploads/SP/spankyjr1/2014-1-16_16395_Leha002.64x64.jpg spankyjr1's Avatar

    spankyjr1

    Small Engine Technician

    Satisfied Customers:

    19
    Journeyman TechnicianWorked on small to large engines for 30 yearsGas,LP,Diesel
  • http://ww2.justanswer.co.uk/uploads/PL/Plumberpro/2014-6-23_6520_image.64x64.jpg Plumberpro's Avatar

    Plumberpro

    Plumber

    Satisfied Customers:

    40
    Fully qualified plumbing , heating and gas engineer 20 years experience
 
 
 

Related Small Engine Questions